Entries by Yngve Bastesen

MudSim, GeoMind, DIG and Oliasoft Join Forces to Shape the Future of De-Risked Drilling

MudSim is proud to exhibit alongside GeoMind, DIG and Oliasoft at IMAGE Houston, demonstrating a shared vision for the next generation of drilling technology. Together, the companies are exploring an AI-supported, integrated platform where real-time data sharing between geology, well design and drilling operations enables smarter decisions, significantly reduces operational risk, and delivers safer, more […]

MudSim and WellSoft Launch Strategic Technology Collaboration

MudSim and WellSoft have entered a strategic cooperation to develop joint projects that combine complementary technologies for smarter drilling operations. By integrating advanced drilling-fluid optimization with formation and well-performance analysis, the partnership aims to improve reservoir productivity. In addition we will de-risk well delivery through more optimized drilling operations.

MudSim milestone: Hole cleaning simulation now integrated in the holistic drilling fluid tool

MudSim has reached an important development milestone. The hole cleaning simulation is now completed and integrated into the MudSim platform as part of our holistic drilling fluid simulation tool. Hole cleaning remains one of the major operational challenges in modern drilling operations, especially in long horizontal wells. When drill cuttings are not effectively transported out […]

Hole cleaning

Is hole cleaning one of the most critical problem for the drilling industry ? How can we avoid this risc with MudSim? ; As wells transition from vertical to horizontal, hole cleaning becomes increasingly complex. Cuttings can settle, reducing efficiency and increasing risks like stuck pipe and excessive torque. MudSim addresses this by simulating drilling […]

MAINTAINING RATE OF PENETRATION WITH WATER-BASED DRILLING FLUIDS

Here we highlight the importance of drilling fluid selection when using WBM and maximizing the rate of penetration (ROP) that we know can be challenging, especially in formations prone to swelling or bit balling. However, with the right strategies, it is possible to maintain efficient drilling rates. In a recent project drilling a 12,25 inch […]

Research application approved

Approval of IPN project from the Research Council of Norway We are thrilled to announce that MudSim has embarked on a transformative 2.5-year R&D project, generously supported by the Norwegian Research Council. This endeavor is driven by our unwavering commitment to push the boundaries of digitization and harness the cutting-edge advancements emerging from the forefront […]